Main Structure of Gwadar Vocational Institute completed.
Islamabad: As scheduled in August 2021, the main structure of the civil engineering construction of Gwadar Technical and Vocational Institute has been accomplished and it lays a strong foundation for the delivery of the project.
As per the Gwadar Pro, the total floor area of this institution is 7,350 square meters. The area includes a training workshop, teaching building, dormitories for students and faculty, multi-functional hall.
The institute`s construction project was started by the end of 2019. This was achieved despite the COVID-19 situation and no hindrance was brought into construction work, hence, it went smoothly throughout.
Under the China-Pakistan Economic Corridor (CPEC), the China-aid Institute is a key project. This project will be the very first vocational institute of Pakistan that considers port and shipping as the mainstay, along with other technical fields as the additional.
As per Naseer Khan Kashani, about 800 students will get training each year in various disciplines present in the institute. Moreover, they will also take part in multiple projects at the free zones and at the port.